article thumbnail

Oil price, Pharos, Tower, Prospex.

Malcolm Graham Wood

Yesterday Prospex announced that the workover rig at Viura was repairing the damaged completion tubing. Oil continues to rise gently as US/Sino talks continue.Today Pharos announces that it has received an extension to its block 125/126 in Vietnam and Tower hires a rig for Thali. The post Oil price, Pharos, Tower, Prospex.

Workover 195
article thumbnail

IDC Advances 15-Well Project in North Rumaila

Iraq Business News: Oil & Gas

During a site visit to rig IDC 59, Khalid Abbas Ali, Head of the First Drilling and Workover Department, explained that well R-839 is the first to be drilled under this contract for Halliburton, which operates under a day-rate system in the BECL-operated field. Drilling operations began on 26 May 2025, targeting the Mishrif formation.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Monumental Energy provides update on the Copper Moki-1 oil and gas well in New Zealand

Oilfield Technology

The primary objective of the CM-1 workover is to restore oil and associated gas production from the Mt. Messenger sands and to remove flow restriction from sand production identified during prior operations.

article thumbnail

Getting a Line on Wireline

Permian Basin Oil and Gas Magazine

The other 60 percent is well logging, toe preps, and workover and production work. They do cased hole work, both vertical and horizontal production. They do plug-and-perf jobs as well, with that [frac-related] work occupying about 40 percent of their time. A toe prep is a preliminary job on a new wellbore that is soon to be frac’d.

Basin 59
article thumbnail

Production Engineer Contact List – CA

Oil Gas Leads

Data Download Center Production Engineer Contact List Download a list of 1000+ Production Engineer contacts that work for Oil & Gas Operators in Canada Buy List Now Here’s an overview of their responsibilities and skills and roles: Skills: Petroleum Engineering, Upstream, Completions, Natural Gas, Drilling, Hydraulic Fracturing, Field Development, (..)

article thumbnail

Oceaneering Signs Contracts with Esso, USA Navy Division

Rigzone

The scope of work includes the provision of multiple work-class remote operated vehicles (ROVs), ROV tooling, intervention workover control systems (IWOCS), satellite communication systems, and subsea inspection, hydrate remediation, and engineering services.

ROV 62
article thumbnail

Prospera Energy Inc. Announces Service Rig Update, Closing of Acquisition, Warrant Amendments, Stock Option Grant, and Shares-for-Debt Settlement

BOE Report

PEI, OTC: GXRFF) (“Prospera“, PEI or the “Corporation“) Service Rig Update Prospera Energy completed a total of thirty-two workovers and reactivations in Q1 2025 before releasing service rigs for spring break-up on March 20th. CALGARY, Alberta, March 25, 2025 (GLOBE NEWSWIRE) — Prospera Energy Inc.

Workover 102