Remove Hydraulic Fracturing Remove Operator Remove Shutdown
article thumbnail

Reusing produced water

Oilfield Technology

There are two primary destinations for PW from onshore operations. The result is operators are spending more to ship PW further and then paying higher prices for disposal volumes, especially at SWD facilities just outside of the SRAs. This could force operators to stop production in previously profitable fields.

article thumbnail

EnerMech secures contract for Dana Petroleum’s Triton FPSO

Oilfield Technology

The contract covers the provision of Offshore Shutdown Support Services for the Triton floating production, storage and offloading (FPSO) vessel, located approximately 120 miles east of Aberdeen in the North Sea. EnerMech CEO, Charles ‘Chuck’ Davison Jr.,

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

One Hundred Octopi and Counting: Lessons in Online Solids Management

Permian Basin Oil and Gas Magazine

How the development, validation, and large-scale deployment of online solids management systems is saving operators money by releasing flowback equipment sooner, minimizing equipment damage due to solids carry-over, and reducing the need for shutdowns and confined space entry cleanout operations. using resin-coated proppants.)

article thumbnail

AI in Oil and Gas – A Game-Changer for Efficiency and Profitability

Aresco

AI-powered technologies are enabling companies to optimize operations, enhance oil and gas exploration, and prevent costly disruptions. From predictive maintenance to real-time data analytics, AI solutions are revolutionizing how oil and gas companies operate, analyze vast amounts of data, and reduce risk across the board.

Gas 95
article thumbnail

EPA Proposes Modifications to Oil & Gas Air Pollution Standards

The Energy Law

In addition, the proposal would create a new NSPS Subpart OOOO to regulate VOC emissions from all oil and gas operations not already covered under Subpart KKK that commence construction, reconstruction, or modification after August 23, 2011. Mg/yr in lieu of achieving 95% emissions control.

Gas 40