article thumbnail

Monumental Energy provides update on the Copper Moki-1 oil and gas well in New Zealand

Oilfield Technology

The primary objective of the CM-1 workover is to restore oil and associated gas production from the Mt. Messenger sands and to remove flow restriction from sand production identified during prior operations.

article thumbnail

IDC Advances 15-Well Project in North Rumaila

Iraq Business News: Oil & Gas

During a site visit to rig IDC 59, Khalid Abbas Ali, Head of the First Drilling and Workover Department, explained that well R-839 is the first to be drilled under this contract for Halliburton, which operates under a day-rate system in the BECL-operated field. Drilling operations began on 26 May 2025, targeting the Mishrif formation.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Snubbing Units In Oil & Gas Field

Drilling Manual

The impression still exists that snubbing or hydraulic workover units are exclusively used on blowouts or otherwise uncontrollable wells, which is false. Read more The post Snubbing Units In Oil & Gas Field appeared first on Drilling Manual.

Field 52
article thumbnail

Production Engineer Contact List – CA

Oil Gas Leads

A Production Engineer in the oil and gas industry plays a critical role in managing and optimizing the production of hydrocarbons from oil and gas reservoirs. Reservoir Pressure Management: Managing reservoir pressure through techniques like water or gas injection to enhance production rates and recovery.

article thumbnail

Oil and Gas Equipment

Pickett Oilfield

Drilling and Workover Equipment for Sale! The post Oil and Gas Equipment appeared first on Pickett Oilfield, LLC. New – Used – Refurbished ~ Learn more about what all we have to offer at Sales@PickettOilfield.com and request a quote.

article thumbnail

DNO reports "Stellar Production" in Iraqi Kurdistan

Iraq Business News: Oil & Gas

DNO ASA , the Norwegian oil and gas operator, today reported 2024 revenues of USD 667 million on the back of what it described as " stellar production " in the Kurdistan region of Iraq. 20+ well workovers and interventions. By John Lee. DNO's Executive Chairman Bijan Mossavar-Rahmani, said: "Our Kurdistan team is doing a terrific job.

article thumbnail

Getting a Line on Wireline

Permian Basin Oil and Gas Magazine

Vertice management said that the acquisition enhances Vertices’ ability “to support wireline service providers and E&P companies with innovative tools and integrated solutions, and broadens its presence across unconventional oil and gas markets.” The other 60 percent is well logging, toe preps, and workover and production work.

Basin 59