Harbour Energy plc announce first oil achieved at Maria Phase 2, Norway
Oilfield Technology
JUNE 27, 2025
All rights reserved | Tel: +44 (0)1252 718 999 | Email: enquiries@oilfieldtechnology.com )
Oilfield Technology
JUNE 27, 2025
All rights reserved | Tel: +44 (0)1252 718 999 | Email: enquiries@oilfieldtechnology.com )
Oilfield Technology
JULY 22, 2025
SLB will deploy its Sequestri™ carbon storage solutions portfolio – which includes technologies specifically engineered and qualified for the development of carbon storage sites – to construct six carbon storage wells. All rights reserved | Tel: +44 (0)1252 718 999 | Email: enquiries@oilfieldtechnology.com
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Oilfield Technology
JULY 1, 2025
Phase 3 involves the installation of two new subsea templates, tied back to existing infrastructure via new pipelines, and represents an important step toward the partnership’s ambition of reaching 75% recovery. The field is operated by Equinor, with Aker BP holding a 31.6% working interest.
Oilfield Technology
JULY 16, 2025
Petrobras). All rights reserved | Tel: +44 (0)1252 718 999 | Email: enquiries@oilfieldtechnology.com
Oilfield Technology
JUNE 27, 2025
Pipelines, water storage lagoons, and treatment plants, quickly came online to manage PW at scale. Their investment in pipelines, storage lagoons, and treatment facilities drastically reduced the cost of treating and moving PW around the basin. The pipelines move water around at a fraction of the cost of trucking.
Oilfield Technology
JULY 2, 2025
All rights reserved | Tel: +44 (0)1252 718 999 | Email: enquiries@oilfieldtechnology.com )
Oilfield Technology
JUNE 20, 2025
All rights reserved | Tel: +44 (0)1252 718 999 | Email: enquiries@oilfieldtechnology.com )
Let's personalize your content