Remove Engineer Remove Pipeline Remove Webinar
article thumbnail

Harbour Energy plc announce first oil achieved at Maria Phase 2, Norway

Oilfield Technology

All rights reserved | Tel: +44 (0)1252 718 999 | Email: enquiries@oilfieldtechnology.com )

article thumbnail

Johan Sverdrup Phase 3 investment decision

Oilfield Technology

Phase 3 involves the installation of two new subsea templates, tied back to existing infrastructure via new pipelines, and represents an important step toward the partnership’s ambition of reaching 75% recovery. The field is operated by Equinor, with Aker BP holding a 31.6% working interest.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Union Jack Oil plc announce resumption of production at Keddington Oilfield

Oilfield Technology

All rights reserved | Tel: +44 (0)1252 718 999 | Email: enquiries@oilfieldtechnology.com )

article thumbnail

Halliburton awarded five year contract in UK North Sea by Repsol Resources UK

Oilfield Technology

All rights reserved | Tel: +44 (0)1252 718 999 | Email: enquiries@oilfieldtechnology.com )

article thumbnail

ConocoPhillips announces oil find at Slagugle discovery in Norwegian Sea

Oilfield Technology

All rights reserved | Tel: +44 (0)1252 718 999 | Email: enquiries@oilfieldtechnology.com )

article thumbnail

Mermaid Subsea completes Southern North Sea wellhead severance project

Oilfield Technology

All rights reserved | Tel: +44 (0)1252 718 999 | Email: enquiries@oilfieldtechnology.com )

article thumbnail

SLB announces digital collaboration with Cactus Drilling

Oilfield Technology

All rights reserved | Tel: +44 (0)1252 718 999 | Email: enquiries@oilfieldtechnology.com )