Remove Engineer Remove Exploration and Production Remove Webinar
article thumbnail

Equinor announces Brazil exploration block award

Oilfield Technology

“We are pleased with our success in today’s bidding round, securing a new exploration opportunity in Brazil – a core country in our international portfolio. Equinor will now work to conduct necessary geological and geophysical assessments for future exploration activities. Already a member?

article thumbnail

Union Jack Oil plc announce resumption of production at Keddington Oilfield

Oilfield Technology

During June 2025, Keddington produced a total of 992 bbl of oil over 23 days of timed pumped production averaging 10.4 The newly installed equipment and facilities are working well and continue to be fine-tuned to optimise production. h/d with an average flow-rate of 43 bpd gross during the period. Already a member?

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Harbour Energy plc announce first oil achieved at Maria Phase 2, Norway

Oilfield Technology

Production from the first well was delivered safely, on time and to budget. This marks the first of the next wave of subsea developments we are bringing on-stream to support production from our Norway business.” Maria Phase 2 is a four well subsea tie-back to existing infrastructure in Harbour’s operated Maria field.

article thumbnail

ConocoPhillips announces oil find at Slagugle discovery in Norwegian Sea

Oilfield Technology

It is the third exploration well drilled in production licence 891, which was awarded during the Awards in Predefined Areas (APA) in 2016. A successful formation test was completed, achieving a maximum production rate of 650 standard m 3 of oil per flow day through a 36/64 in. nozzle opening. Already a member?

article thumbnail

Expro secures contract with Woodside Energy for Trion deepwater project

Oilfield Technology

Under the agreement, Expro will provide industry-leading tubular running services (TRS) and cementing services for what will be Mexico’s first deepwater oil production facility – a major milestone in the region’s energy evolution. Already a member?

52
article thumbnail

Johan Sverdrup Phase 3 investment decision

Oilfield Technology

Total investments are estimated at NOK 13 billion, with production expected to commence in the fourth quarter of 2027. This investment decision is in line with previous communication and is already reflected in Aker BP’s guidance for investments and production outlook. The notification is subject to regulatory approval.

article thumbnail

Union Jack Oil plc sign farm-in agreement with Reach Oil and Gas for the Sark Drilling Project

Oilfield Technology

Secondary targets productive in the immediate area include the Prue Sands, Red Fork and Base Pennsylvanian Sands. 3D supported Sark well will drill a dip and fault closed large structure of 156 acres area and 40 ft relief Estimated recoverable resources of 1 440 000 bbls of oil gross. Already a member?

52