Remove Completion Remove Spud-in Remove Sustainability
article thumbnail

Williston Basin White Paper

Oil Gas Leads

This report profiles 36 active operators —each of which has spud at least one new well since 2023 —providing a detailed look at production volumes, drilling activity, core acreage, and strategic focus. Refracs & EOR Gaining Traction Operators are increasingly revisiting older wells with modern completions.

article thumbnail

Top 5 Trends Reshaping Oil & Gas Strategy in 2025

Oil Gas Leads

Today’s leading companies are: Reducing capital spend while sustaining production Maximizing rig and frac crew efficiency Avoiding knee-jerk cost cuts during downturns Take Chevron as an example. Operational Innovation: Doing More with Less From drilling to completions, the U.S. Devon Energy improved completions efficiency by 12%.

Gas
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Top 5 Diamondback Energy Trends to Watch in Late 2025

Oil Gas Leads

In Q2 2025, the company dropped three drilling rigs and one completion crew, shaving $400 million off its capital budget. Key integration wins : Lowered corporate breakeven to $37/bbl 2–3% well cost savings via procurement efficiencies 7-day average spud-to-TD times on 13,000’ laterals The strategic goal?

article thumbnail

Prairie Operating Co. announces 11-well development at Rusch Pad

Oil & Gas 360º

The first well was spud on April 1, 2025, utilizing Precision E-Drilling Rig 461, as part of the Companys continued strategy to expand production and enhance operational efficiencies in the Denver-Julesburg (DJ) Basin. Drilling is expected to be completed by early June, with hydraulic fracturing commencing shortly after.

article thumbnail

FIFTH CIRCUIT BEGINS TO CLEAN UP ITS JURISPRUDENCE ON HOW TO DETERMINE WHETHER A CONTRACT IS (OR IS NOT) MARITIME

The Energy Law

and (2) Does the contract provide or do the parties expect that a vessel will play a substantial role in the completion of the contract? Turning to the second test, the court noted that the specific work order for the P&A job called for the use of three vessels — a supply barge, a tug, and the spud barge OB 808.

E&P