Remove Completion Remove Gas Remove Workover
article thumbnail

IDC Advances 15-Well Project in North Rumaila

Iraq Business News: Oil & Gas

During a site visit to rig IDC 59, Khalid Abbas Ali, Head of the First Drilling and Workover Department, explained that well R-839 is the first to be drilled under this contract for Halliburton, which operates under a day-rate system in the BECL-operated field. Drilling operations began on 26 May 2025, targeting the Mishrif formation.

article thumbnail

Getting a Line on Wireline

Permian Basin Oil and Gas Magazine

On April 1, Atlanta, Ga.-based acquired Pintail Alternative Energy, aka Pintail Completions, aka Pintail Wireline. Greenwell expects to “bring an expanded pipeline of new wireline and completion technologies to market.” The other 60 percent is well logging, toe preps, and workover and production work. based RPC Inc.

Basin 59
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Production Engineer Contact List – CA

Oil Gas Leads

A Production Engineer in the oil and gas industry plays a critical role in managing and optimizing the production of hydrocarbons from oil and gas reservoirs. Optimizing drilling and completion strategies to maximize well productivity and longevity.

article thumbnail

DNO reports "Stellar Production" in Iraqi Kurdistan

Iraq Business News: Oil & Gas

DNO ASA , the Norwegian oil and gas operator, today reported 2024 revenues of USD 667 million on the back of what it described as " stellar production " in the Kurdistan region of Iraq. 20+ well workovers and interventions. Operational Overview Well testing program completed in Q4. By John Lee.

article thumbnail

Oil Review Middle East - Untitled Article

Oil Review Middle East

Dubai-based Viking Completion Technology is expanding its operations in Saudi Arabia following successful results from trial projects The provider of well completion equipment and services deployed its well completion design, manufacturing, and service expertise for five projects across the Kingdom between September 2023 and November 2024.

API 40
article thumbnail

Production in Paying Quantities: Maintaining Mineral Leases Beyond Their Primary Terms with Production of Oil or Gas

The Energy Law

In Louisiana, as in most jurisdictions, production of oil or gas must be in “paying quantities” to maintain a mineral lease beyond its primary term. [1] 6] In contrast, capital expenditures and expenses that are “extraordinary and largely nonrecurring in nature,” such as drilling and completion costs, are not considered. [7]

Oil 40
article thumbnail

Permeability: Key Concepts and Applications Explained

PetroSync

porous tests and formulas are useful for examining reservoirs in the oil and gas sector and determining the compatibility of building materials. Permeability is described as a material’s ability to enable fluids to pass through it. It is an essential feature for businesses that rely on efficient fluid transport.