Remove Completion Remove Engineering Remove IT
article thumbnail

GAIL Completes First LNG Discharge at Dabhol

Rigzone

has completed the first berthing and discharge operation at the Dabhol LNG terminal. has completed the first berthing and discharge operation at the Dabhol LNG terminal. The company welcomed the vessel GAIL Bhuwan at the facility following the completion of the breakwater project, GAIL said in a media release.

article thumbnail

The State of AI Adoption in Reservoir Engineering: 2024–2025 Comparative Analysis

Novi

The numbers don’t lie: reservoir engineering just crossed a line it can’t uncross. based reservoir engineers reveals a profession that has reached a strategic inflection point. Engineers have moved beyond proof-of-concept thinking. Engineers are taking control because they have to live with the consequences.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

The First Oil Well in the World – Bibi Heybat

Aresco

The 1846 Breakthrough: Bibi Heybat Well In 1846, long before the American oil boom, the world’s first mechanically drilled oil well was completed at Bibi Heybat, just south of Baku. The well was drilled under the guidance of engineer Vasily Semyonov, who worked for the Russian Imperial administration.

Oil 111
article thumbnail

Completions Consultant Contact List CA

Oil Gas Leads

Completions Consultant plays a crucial role in the oil and gas industry, specifically in the final stages of well construction and preparation for production. Their primary focus is on the completion phase of drilling operations. This includes determining the type of completion (e.g.,

article thumbnail

Top 5 Frac Trends Reshaping Oil & Gas in 2025

Oil Gas Leads

From triple-frac mega pads to fully automated completions, here are the top five trends defining hydraulic fracturing in 2025: 1. Triple-Frac Efficiency: Chevron’s Breakthrough Chevron is scaling a triple-frac strategy in the Permian, completing three wells simultaneously. The result?

article thumbnail

How Customizable JT Skids Are Optimizing Gas Processing

Pro-Gas Services

For engineers and project managers across the Texas energy landscape, the core challenge remains the same: how to maximize the recovery of valuable products, meet stringent quality specifications, and maintain cost-effectiveness. In the dynamic and demanding world of natural gas processing, the pursuit of efficiency is relentless.

Gas 52
article thumbnail

Mermaid Subsea completes Southern North Sea wellhead severance project

Oilfield Technology

” It has been an industrious year to date for Mermaid, which recently announced the safe and successful completion of a scale inhibitor treatment on the Teal P2 well, part of the Anasuria Cluster in the Central North Sea. Also conducted from the Island Valiant vessel, this time on behalf of Anasuria Operating Co. (AOC),