Remove Completion Remove Electronics Remove Petroleum
article thumbnail

EnerMech Bags Triton FPSO Work

Rigzone

Image by Redhuan Ramli via iStock EnerMech Limited has secured a three-year contract with Dana Petroleum Limited for Offshore Shutdown Support Services for the Triton floating, production, storage, and offloading (FPSO) vessel. The Triton FPSO is located approximately 120 miles east of Aberdeen in the North Sea. EnerMech CEO, said.

article thumbnail

EnerMech secures contract for Dana Petroleum’s Triton FPSO

Oilfield Technology

Dana Petroleum has operated the Triton FPSO since 2012, playing a key role in the region’s energy landscape since oil production began in 2000. Securing this long-term partnership with Dana Petroleum is a testament to our technical capabilities, innovation, and ability to deliver value across the full lifecycle of an asset.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

3 Ways That Transport is Becoming More Eco-Friendly

Energy Refuge

They also wouldn’t require rest stops in the way that people do, allowing them to complete work faster and spend less time on the road. These driverless cars also tend to be completely electric in their operation. This negates many of the environmental benefits of an electronic vehicle. Alternative Fuels.

article thumbnail

Generative AI powered Virtual Data Rooms for Energy

AWS: Energy (Oil & Gas)

Initially, they presented static documents in electronic formats, necessitating users to still visit physical locations and offering limited data manipulation capabilities. The systems maintain complete audit trails of all interactions for security analysis. VDRs evolved as digital versions of physical data rooms.

Energy 64