Remove Casing Remove Management Remove Project Manager
article thumbnail

Baker Hughes awarded Equinor contract for P&A work in North Sea

Oil & Gas 360º

Baker Hughes has a history of successful integrated P&A projects, as well as its innovative portfolio of Mature Assets Solutions with a proven track record of increasing efficiency, accelerating timelines and reducing total operating costs. Planning for Oseberg East is now underway, and the execution is scheduled to begin in 2026.

article thumbnail

Find High-Capacity POIs Fast With ATC Data in Enverus PRISM®

Enverus

Using the PRISM application, developers can track both planning case ATC values and historical state estimator ATC values from the ISO at the substation level to identify substations with feasible injection capabilities for their future power plants. What is a planning case? What is State Estimator ATC?

Casing 130
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

How Enverus PRISM® Drives Success in Siting Power Assets 

Enverus

Success in the Queue: Faster, Bigger, More Reliable Projects This Enverus PRISM dashboard tracks the geographic distribution, capacity and technology mix of U.S. Identify POIs with superior capacity, streamline siting workflows and increase confidence in project profitability with historical analysis and forward-looking planning case views.

article thumbnail

How Customizable JT Skids Are Optimizing Gas Processing

Pro-Gas Services

For engineers and project managers across the Texas energy landscape, the core challenge remains the same: how to maximize the recovery of valuable products, meet stringent quality specifications, and maintain cost-effectiveness. In the dynamic and demanding world of natural gas processing, the pursuit of efficiency is relentless.

Gas 52
article thumbnail

Baker Hughes Scores Plug and Abandonment Job from Equinor

Rigzone

“Our Mature Assets Solutions experts are well equipped to manage every phase of plug and abandonment and optimize operations to meet Equinor’s well abandonment goals”, Amerino Gatti, executive vice president of Oilfield Services and Equipment at Baker Hughes, said.

article thumbnail

Don’t cancel or coddle at-risk capital projects—challenge them

McKinsey

Skip to main content Don’t cancel or coddle at-risk capital projects—challenge them July 16, 2025 | Article Today’s volatility leaves multibillion-dollar capital projects with little room for error. The goal is to confirm early-stage project readiness, technical design validity, and business-case credibility.

article thumbnail

How a generative AI Q&A app can be used in the oil and gas sector to improve the speed and accuracy of information retrieval from documents

AWS: Energy (Oil & Gas)

From engineering blueprints to compliance reports, these documents form the backbone of daily operations, project management, and regulatory adherence. End-to-end RAG workflow with Amazon Bedrock Knowledge Bases Amazon Bedrock Knowledge Bases offers a fully managed solution for implementing RAG workflows in generative AI applications.

API 66