Remove BBL Remove Exploration and Production Remove HSE
article thumbnail

Union Jack Oil plc announce resumption of production at Keddington Oilfield

Oilfield Technology

During June 2025, Keddington produced a total of 992 bbl of oil over 23 days of timed pumped production averaging 10.4 The newly installed equipment and facilities are working well and continue to be fine-tuned to optimise production. h/d with an average flow-rate of 43 bpd gross during the period. Already a member?

article thumbnail

ConocoPhillips announces oil find at Slagugle discovery in Norwegian Sea

Oilfield Technology

million bbl of oil equivalent in Triassic reservoir rocks. It is the third exploration well drilled in production licence 891, which was awarded during the Awards in Predefined Areas (APA) in 2016. The Slagugle oil discovery was initially proven in 2020, with preliminary estimates suggesting resources in the range of 30.8 - 61.6

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Johan Sverdrup Phase 3 investment decision

Oilfield Technology

The project includes new subsea infrastructure that will increase recoverable volumes by 40 – 50 million bbl of oil equivalent. Total investments are estimated at NOK 13 billion, with production expected to commence in the fourth quarter of 2027. The field is operated by Equinor, with Aker BP holding a 31.6% working interest.

article thumbnail

Reusing produced water

Oilfield Technology

Every year billions of barrels of Produced Water (PW) are generated from oil and gas production around the world. Most of this water goes back into the producing formations via injection wells as part of IOR and EOR programs to get more production from ageing fields. As fields age, they generate higher water to oil ratios.

article thumbnail

Union Jack Oil plc sign farm-in agreement with Reach Oil and Gas for the Sark Drilling Project

Oilfield Technology

3D supported Sark well will drill a dip and fault closed large structure of 156 acres area and 40 ft relief Estimated recoverable resources of 1 440 000 bbls of oil gross. 3D supported Sark well will drill a dip and fault closed large structure of 156 acres area and 40 ft relief Estimated recoverable resources of 1 440 000 bbls of oil gross.

Oil