Remove Basin Remove Gas Remove Sidetracking
article thumbnail

SS-2H IP60 Flow Rate Sets Beetaloo Basin Record

Rigzone

Image by Alexey Zakirov via iStock Tamboran Resources Corporation has reported that the Shenandoah South 2H sidetrack (SS-2H ST1) well achieved an average 60-day initial production (IP60) flow rate of 6.8 million cubic feet per day (MMcf/d), a Beetaloo Basin record. million cubic feet per day. million cubic feet per day.

Basin 62
article thumbnail

Production Resumes at Keddington Oilfield

Rigzone

Planning approval for additional drilling is already secured, offering an opportunity to boost production through a development sidetrack from an existing well, the company said. MORE FROM THIS AUTHOR Paul Anderson Writer OIL, GAS & ENERGY NEWS STRAIGHT TO YOUR INBOX! There’s a reason 700K+ energy professionals have subscribed.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Permian Basin Top Rigs by Wells Drilled Since 2024

Oil Gas Leads

Oil Gas Leads Drilling Operations : All wells drilled by T138 were horizontal, indicating the rig’s capability in advanced directional drilling techniques. The post Permian Basin Top Rigs by Wells Drilled Since 2024 appeared first on Oil Gas Leads. Performs consistently and gets the job done.

Basin 52
article thumbnail

BP and Chevron Hit Oil in Deepwater Gulf of America

Rextag

The discovery comes amid BP's broader pivot away from rapid renewables expansion toward reinforcing its upstream oil and gas portfolio to meet investor expectations and improve financial performance. The initial well and a sidetrack successfully encountered oil in high-quality Miocene-age reservoirs. 2 billion annually.

Oil 52