Remove 2028 Remove Basin Remove Pipeline
article thumbnail

Intensity Infrastructure, Rainbow Energy to Build New Gas Pipeline in ND

Rigzone

Image by Denis Shevchuk via iStock Intensity Infrastructure Partners LLC has partnered with power producer Rainbow Energy Center LLC to construct a new pipeline to bring Bakken gas to eastern North Dakota. Phase 1 would build a 136-mile, 36-inch pipeline with a capacity of about 1.1 million dekatherms a day. billion cubic feet.

article thumbnail

LNG Canada Begins Production – A Game-Changer for Western Canadian Gas

Oil Gas Leads

export pipelines. coast and expected online between 2027 and 2028 , potentially doubling Canadian LNG export capacity by the end of the decade. Oil & Gas Canada Account Directory – $10 Purchase Now Includes: Account Name, Location, Phone, Website, Wells Drilled… Key Takeaways: Initial capacity online: Train 1 (5.6

Gas 52
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

The Iberian green industrial opportunity: Carbon capture and storage

McKinsey

percent for 2028 to 2030, based on ETS directive, “Directive 2003/87/EC of the European Parliament and of the Council of 13 October 2003 establishing a M9 system for the greenhouse gas emission allowance trading within the M9 Union and amending Council Directive 96/61/EC,” European Union, March 1, 2024. percent, dropping to around 0.8

article thumbnail

Kinder Morgan Sees Increase in Profit on Higher Volumes

Rigzone

Kinder Morgan’s natural gas pipelines carried 44.59 Its products pipelines transported 1.02 Its products pipelines transported 1.02 Adjusted earnings before interest, taxes, depreciation and amortization grew six percent from $1.86 billion to $1.97 trillion British thermal units per day (Btupd) during Q2 2025, up from 43.12

article thumbnail

Tallgrass announces anchor shipper agreement for new pipeline from Permian

Permian Basin Oil and Gas Magazine

Denver-based Tallgrass said last week it completed anchor shipper agreements for a new pipeline that will transport natural gas from multiple points in the Permian Basin to the Rockies Express pipeline and other points of delivery. Target in-service date is late 2028. Pipeline capacity is designed for up to 2.4

article thumbnail

ONEOK’s Expanding Footprint in the Permian Basin

Oil Gas Leads

The Permian Basin continues to be a driving force behind U.S. Heres a breakdown of what was said about the companys investments and outlook for the basin. Heres a breakdown of what was said about the companys investments and outlook for the basin. oil and gas production, and ONEOK Inc. Bcf/d in 2025.

Basin 52
article thumbnail

100 Mbbl/d increase in Canadian oil sands sends condensate demand up, AECO gas prices down

Enverus

Key takeaways from the report: EIR estimates that non-upgraded Canadian oil sands production will rise by around 100 Mbbl/d annually until 2028. This will result in substantial demand growth for in-basin condensate volumes because of increased need for diluent.