article thumbnail

Utility Companies EQT is Supplying 1.2 Bcf/d of Gas Revealed

Marcellus Drilling News

billion cubic feet per day (Bcf/d) of EQT’s molecules. Those molecules will flow on the Mountain Valley Pipeline (MVP) beginning in 2027 (see EQT Sets New.

BCF 169
article thumbnail

Is Appalachia the Answer? U.S. Natural Gas Giants Eye New Pipelines

Rextag

delivering over 35 billion cubic feet per day (Bcf/d)—about 31% of the nation's marketed production. Bcf/d last year, supported by new LNG export plants and expanding power generation needs. Bcf/d last year, supported by new LNG export plants and expanding power generation needs. Despite this bottleneck, broader U.S.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

From Landfill to Leadership: EQT Acquires Majority Stake in Waga Energy for $611M

Rextag

Bcf/d beginning in 2027. Bcf/d Southeast Supply Enhancement, expected online in Q4 2027, reinforcing long-term supply and infrastructure alignment. Recent Update: EQT Signs 10-Year Gas Supply Deals with Duke and Southern EQT Corp. Duke and Southern are also key shippers on Williams’ 1.6

Energy 52
article thumbnail

LNG Canada Begins Production – A Game-Changer for Western Canadian Gas

Oil Gas Leads

bcf/d in 2024 (up from 8 bcf/d in 2023), LNG Canada’s launch could redirect volumes to global buyers , potentially easing U.S. coast and expected online between 2027 and 2028 , potentially doubling Canadian LNG export capacity by the end of the decade. export pipelines. Trade flow shift: With Canadian gas exports to the U.S.

Gas 52
article thumbnail

Kinder Morgan founder plays down the impact of tariffs on U.S. LNG

Oil & Gas 360º

Meanwhile, Kinder Morgans LNG transport contracts are already locked and loaded: 7 Bcf/d now, expected to hit 11 Bcf/d by 2027. That includes chunky new projects like the $1.6 billion Trident line and the $1.7 billion Mississippi Crossing system. And as for AI forecasts being too rosy? Kinder didnt blink.

BCF 130
article thumbnail

Pains and gains in the Haynesville

Enverus

There could be as much as 6 Bcf/d of underutilized pipeline capacity over the next decade in the Haynesville. Bcf/d of takeaway capacity by the end of this year. Bcf/d of capacity is expected by 2027. Prices at the Katy and Carthage trading points should stabilize in 2028 and beyond but expect a bumpy ride until then.

BCF 130
article thumbnail

FROM KATY TO THE COAST: WILL KINDER MORGAN’S $1.7B TRIDENT PIPELINE MAKE NATURAL GAS MORE RELIABLE?

Rextag

Bcf/d and is set to commence operations in the first quarter of 2027, pending regulatory approvals. Bcf/d capacity project. Bcf/d capacity project connecting the Permian Basin to the Agua Dulce hub. Bcf/d capacity project connecting the Permian Basin to the Agua Dulce hub. The pipeline will have a capacity of 1.5