Remove 2012 Remove Field Remove Petroleum
article thumbnail

MIDTAP Achieves Unprecedented Growth in Petroleum Trading, Zero Accidents, Injuries in 2024

Egypt Oil & Gas

Minister of Petroleum and Mineral Resources Karim Badawi attended the General Assembly meeting of the Middle East Oil Tankage & Pipelines (MIDTAP) company to discuss its 2024 performance. The total volume of petroleum products traded on the company’s marine dock reached 4.7 million tons in 2024, compared to 1.6

article thumbnail

Energy Transfer’s Executive Chairman Kelcy Warren

Energy Transfer

His $10 million donation in 2012 was instrumental in the creation of Klyde Warren Park , a beloved 5.2-acre Warren gifted UT-Arlington $12 million “to help elevate UTA to the forefront of the growing resource and energy engineering (REE) field,” the university said in a news release.

Energy 52
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A Believer in This Business

Permian Basin Oil and Gas Magazine

Thank God Youre Going to Get a Real Job Thats what Millers grandfather Jerry Cunningham said upon learning that his grandson was leaving accounting for the oil field. After that, Miller spent 2011 and 2012 in Dubai as head of business development, while the family remained stateside. And the Baroid position leads to another mentor.

article thumbnail

President Biden Faces Constitutional Challenges to Revocation of Keystone XL Permit

The Energy Law

Background The Keystone Pipeline is a system of petroleum pipelines designed to transport crude oil from fields in Alberta, Canada and ultimately terminating at refineries on the U.S A few months later, in May 2012, TC renewed its application, and again, the project underwent more than three years of review. Constitution.

article thumbnail

President Biden Faces Constitutional Challenges to Revocation of Keystone XL Permit

The Energy Law

The Keystone Pipeline is a system of petroleum pipelines designed to transport crude oil from fields in Alberta, Canada and ultimately terminating at refineries on the U.S A few months later, in May 2012, TC renewed its application, and again, the project underwent more than three years of review. Constitution. Background.