article thumbnail

IDC Advances 15-Well Project in North Rumaila

Iraq Business News: Oil & Gas

The Iraqi Drilling Company (IDC) is making steady progress on its project to drill 15 oil wells in the North Rumaila field , working in coordination with Halliburton and Basra Energy Company Limited (BECL). Drilling operations began on 26 May 2025, targeting the Mishrif formation. Preparations are under way to install 9 casing.

article thumbnail

Snubbing Units In Oil & Gas Field

Drilling Manual

The impression still exists that snubbing or hydraulic workover units are exclusively used on blowouts or otherwise uncontrollable wells, which is false. Read more The post Snubbing Units In Oil & Gas Field appeared first on Drilling Manual.

Field 52
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

DNO reports "Stellar Production" in Iraqi Kurdistan

Iraq Business News: Oil & Gas

At Kurdistan's Tawke license (75 percent and operator), DNO increased gross production from the Tawke and Peshkabir fields by 70 percent year-on-year to 78,600 boepd in 2024, with oil sold at its Fish Khabur terminal as the Iraq-Trkiye export pipeline remained shut in. Tawke field: 27,864 bopd (-6% from Q3).

article thumbnail

Subsea Plugging & Abandonment: Light Well Intervention Vessel Overview

Drillers

Category B: Vessel can perform workover (pulling and running tubing) and riser operations with coiled tubing (CT) ability. In addition, these units are equipped with workover equipment which implies that they can perform full P&A operations and a variety of well interventions. MODUs or cat.