Remove Drilling rig Remove Topsides Remove Upstream
article thumbnail

Seatrium: first turnkey FPSO delivery to Petrobras

Oilfield Technology

Seatrium’s global teams have fabricated the topside modules weighing an impressive 54,000 MT across its shipyards in Singapore, China and Brazil, in addition to the integration and commissioning works of the P-78 FPSO in Singapore. Image: FPSO P-78 sailing to Buzios field in Brazil. Photo Credit: Seatrium).

article thumbnail

Derisking MPD operations

Oilfield Technology

Supplied with the appropriate riser connection and auxiliary line configuration, it seamlessly integrates with a vessel’s existing riser system as it’s compatible with multiple risers and topside equipment from various MPD suppliers. Please sign in or register for free.