Remove Drilling rig Remove Mechanic Remove Offshore
article thumbnail

New Phase to Add 1 Tcf Natural Gas to Zohr Reserves

Egypt Oil & Gas

This phase involves the use of a floating processing unit in the offshore well area, located 220 km from the shore, to separate natural gas and condensates. It is worth noting that Enis Saipem 10000 drilling rig is continuing developmental drilling operations as part of the fields development project.

article thumbnail

The Crucial Role of Plastic Thread Protectors in Ensuring Project Success

DIC Oil Tools

The sealing mechanism is achieved through the interference of smooth metal surfaces located at the front of the threaded area. Additionally, these threaded ends are frequently exposed to corrosive environments while in storage.