Remove Condensate Remove Mechanic Remove Petroleum
article thumbnail

New Phase to Add 1 Tcf Natural Gas to Zohr Reserves

Egypt Oil & Gas

This phase involves the use of a floating processing unit in the offshore well area, located 220 km from the shore, to separate natural gas and condensates. The workshop discussed the future of the Zohr field project and production sustainability, with a focus on the third phase of the project.

article thumbnail

The Importance of Vapor Recovery Units in Reducing Emissions

Pro-Gas Services

They are specifically designed to capture Volatile Organic Compounds (VOCs) that would otherwise escape into the atmosphere during the storage and transfer of petroleum products and other VOC-containing liquids. Condensation Condensation is a process that takes advantage of the physical properties of VOCs.