Remove Condensate Remove Control Systems Remove Operator
article thumbnail

Understanding the Technical Aspects of Vapor Recovery Units

Pro-Gas Services

In pursuit of efficiency and minimal environmental impact, vapor recovery units (VRUs) are now indispensable in gas processing operations. At Pro-Gas LLC, we recognize the critical role these systems play in our commitment to sustainable and profitable operations. This is essential for our commitment to sustainable operations.

article thumbnail

The Importance of Field Gas Conditioners and JT Skids in the Oil and Gas Industry

Pro-Gas Services

The name “JT skid” is derived from the Joule-Thomson effect , a fascinating thermodynamic principle that underpins the system’s operation. In a JT skid, this principle is harnessed to cool and condense the gas, facilitating the separation of liquids and impurities.

Field 52
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Maximizing Efficiency in Natural Gas Liquid (NGL) Production

Pro-Gas Services

Second, removing NGLs from natural gas ensures that the gas meets pipeline specifications and avoids issues like condensation and two-phase flow. These include: Cryogenic Processing: This method uses extremely low temperatures to condense and separate NGLs from natural gas.

article thumbnail

Khalda Petroleum Investments to Reach $1B in 2024/25

Egypt Oil & Gas

million cubic feet of gas per day (mscf/d), and the AHMOS-3X well with a production capacity of 28 mscf/d of gas and 153 barrels of condensates, in addition to the WD-9-E1X well with a production capacity of 1,710 bbl/d of oil. Additionally, 51 recompletion operations will be carried out, along with the completion of 11 exploratory wells.

article thumbnail

10 Good reasons to use a Plate & Frame Gasketed Heat Exchanger GPHE

Scambio Termico

In case of System Builders manufacturing skid mounted unit, this advantage allows more compact executions, in terms of size and weight 3. In case of new operating conditions is possible increase plate pack after installation, while Shell & Tube HX heat transfer area (HTA) is fixed. Sanitary execution.

Casing 52