Remove Completion Remove Information Remove Temporarily Abandoned
article thumbnail

Subsea Plugging & Abandonment: Light Well Intervention Vessel Overview

Drillers

Category D: Production Drilling, with focus on completion and intervention needs. C are conventional rigs with low-pressure risers traditionally used for drilling and completing wells. Let us digest some general information on abandonment types and phases. Preparing to land the stack What Abandonment Types are There?

article thumbnail

Improving Plugging and Abandonment Procedures

Permian Basin Oil and Gas Magazine

But accurate downhole information is essential for generating proper plugging procedures. If a temperature or bond log was not run at completion (or is lost), then a bond log should be run prior to plugging, unless cement circulation is proven in the record. This is not currently required by the RRC. Stories exist of 9.5-pound