Subsea Plugging & Abandonment: Light Well Intervention Vessel Overview

Drillers

Category D: Production Drilling, with focus on completion and intervention needs. C are conventional rigs with low-pressure risers traditionally used for drilling and completing wells. Well Abandonment Phases During well abandonment, there are three main phases: (4 actually, as pre-planning is phase 0) 0. MODUs or cat.

article thumbnail

Improving Plugging and Abandonment Procedures

Permian Basin Oil and Gas Magazine

If a temperature or bond log was not run at completion (or is lost), then a bond log should be run prior to plugging, unless cement circulation is proven in the record. However, a shut-in or temporarily abandoned well will only degrade with time due to the downhole fluid exposure. Set timelines for plugging a well.