Remove Casing Remove Petroleum Remove Workover
article thumbnail

Getting a Line on Wireline

Permian Basin Oil and Gas Magazine

They do cased hole work, both vertical and horizontal production. The other 60 percent is well logging, toe preps, and workover and production work. The junk basket/gauge ring run employs a tool (the junk basket) with a ring attached to the tool that is “almost drift of the casing.” active in the Delaware), and Civitas.

Basin 59
article thumbnail

Production in Paying Quantities: Maintaining Mineral Leases Beyond Their Primary Terms with Production of Oil or Gas

The Energy Law

4] Paying quantities cases usually focus on what expenses constitute “operating expenses.” “Operating expenses”—or “lifting expenses” as they are sometimes referred—are “ordinary, recurring expenses” that are attributable to the expense of production, after the well is drilled and completed. [5] McKinney , 545 So. 2d 1216, 1220 (La.

Oil 40