Remove Casing Remove Completion Remove Workover
article thumbnail

IDC Advances 15-Well Project in North Rumaila

Iraq Business News: Oil & Gas

During a site visit to rig IDC 59, Khalid Abbas Ali, Head of the First Drilling and Workover Department, explained that well R-839 is the first to be drilled under this contract for Halliburton, which operates under a day-rate system in the BECL-operated field. Preparations are under way to install 9 casing.

article thumbnail

Subsea Plugging & Abandonment: Light Well Intervention Vessel Overview

Drillers

Category B: Vessel can perform workover (pulling and running tubing) and riser operations with coiled tubing (CT) ability. Category D: Production Drilling, with focus on completion and intervention needs. C are conventional rigs with low-pressure risers traditionally used for drilling and completing wells. MODUs or cat.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Production in Paying Quantities: Maintaining Mineral Leases Beyond Their Primary Terms with Production of Oil or Gas

The Energy Law

4] Paying quantities cases usually focus on what expenses constitute “operating expenses.” “Operating expenses”—or “lifting expenses” as they are sometimes referred—are “ordinary, recurring expenses” that are attributable to the expense of production, after the well is drilled and completed. [5]

Oil 40
article thumbnail

Louisiana Second Circuit Finds Holder of Mortgage Encumbering a Mineral Lease Solidarily Liable with Mineral Lessees for Damages Under the Louisiana Mineral Code

The Energy Law

1] In the case, a landowner sued its mineral lessees for: (1) failure to provide a recordable act evidencing the expiration of a mineral lease under Mineral Code articles 206-209 and (2) failure to pay royalties under Mineral Code articles 137-140. [2] Tauren Exploration, Inc. , 4] $242,029.26 6] $936,803.00 Rhymes ( jdrhymes@liskow.com ).

Royalty 40