Remove BBL Remove Completion Remove Downstream
article thumbnail

Azule Energy starts production from Agogo FPSO

Oil & Gas Journal

The fields have combined estimated reserves of about 450 million bbl with projected peak production of 175,000 b/d produced via the Agogo and Ngoma FPSOs. He has also served as a principal technical professional at Halliburton and as a completion engineer at ConocoPhillips. Topside and marine systems are fully electric.

article thumbnail

Kuwaiti Producers Partner With OilPro & KamberFab to Build API Tanks

OilPro

So w hat to do when your client says “but I really want a Canadian-style, non-field erected, engineered, shop-built 2,500 Bbl tank”? Engineers need to calculate nozzle loads, wind loads, venting and keep up and downstream components in mind. API 650 Guideline 2,500 Bbl tanks and then truck them to site.

API