Remove Basin Remove Completion Remove Temporarily Abandoned
article thumbnail

Improving Plugging and Abandonment Procedures

Permian Basin Oil and Gas Magazine

If a temperature or bond log was not run at completion (or is lost), then a bond log should be run prior to plugging, unless cement circulation is proven in the record. However, a shut-in or temporarily abandoned well will only degrade with time due to the downhole fluid exposure. Set timelines for plugging a well.