Improving Plugging and Abandonment Procedures
Permian Basin Oil and Gas Magazine
MARCH 27, 2025
If a temperature or bond log was not run at completion (or is lost), then a bond log should be run prior to plugging, unless cement circulation is proven in the record. However, a shut-in or temporarily abandoned well will only degrade with time due to the downhole fluid exposure. Set timelines for plugging a well.
Let's personalize your content