Remove 2023 Remove Field Remove Technician
article thumbnail

MADE IN AMERICA: U.S.-Built Offshore Wind Substation and Support Vessels Start to Set Sail for Federal Waters

The Energy Law

On May 25, 2023, the Nation’s first U.S.-built The 262-foot-long SOV just reached 50% completion this April of 2023 after logging over 275,000 work hours. Once completed, ECO Edison will house 60 American wind turbine technicians as they work offshore servicing and maintaining the Revolution, Sunrise, and South Fork Wind projects.

article thumbnail

Taking Carbon Captive

Permian Basin Oil and Gas Magazine

Seen here are two 14 Oil States Enform formConnect assemblies on their way to the field. This lets Oil States technicians connect a new upper casing or wellhead to a stump of cut-out casing below the surface, to make a seal equivalent to the original premium casing connections in axial load and pressure sealing ratings.

Casing 59
article thumbnail

Top 5 ArcGIS Pro Styles for the Geoenergy Industry

Exprodat

The distinction reflects convention for symbolising oil and gas fields as red or green by different regions and governments (a bit like the convention for green or blue being the colour for cheese and onion or salt and vinegar crisps in the UK!). Esri (2023) PowerPlants_Symbology. and Harrower, M. 2013) ColorBrewer 2.0. Crameri, F.,