Remove 2011 Remove Maintenance Remove Project Manager
article thumbnail

Methanex Egypt Completes Pipeline Construction for Methanol Delivery to SMD Plant in Damietta Region

Egypt Oil & Gas

Since the beginning of operations in 2011, the Egyptian Petrochemicals Holding Company has successfully achieved local methanol sales of 1.6 The project, launched in April 2023, involved all phases from engineering, design, and procurement to fabrication, construction, and installation of protection and monitoring systems.

article thumbnail

The differences between vertical moving beds and rotary drums

Scambio Termico

Cleaning and maintenance Solexs vertical moving bed heat exchangers resemble rectangular silos featuring large access doors on either one or two sides of the equipment. In addition, the limited number and size of moving parts means there is minimal wear, routine maintenance and spare spares required to ensure continued operation.